Regional park and ride facilities (Parkways)

Each of the five major rail corridors into Melbourne will include park and ride facilities- to be known as Parkways - to encourage people to leave their cars at the station and take the train when travelling to and from the metropolitan area.

Information on this page


Park and ride locations

The following locations have been announced:

Bacchus Marsh

LocationBacchus Marsh Railway Station
(Ballarat rail line)
Features
  • Upgraded and extended car parking providing an extra 160 places
  • Improved facilities including a new covered walkway
  • New roadside signage
Progress
  • Project completed January 2008
Construction detailsDesign and planning: Hyder Consulting
Construction: BMD Constructions

Ballan

LocationBallan Railway Station
(Ballarat rail line)
Features
  • 135 space car park
  • New covered walkway
  • Improved lighting
  • Closed Circuit TV coverage in the car park
  • New roadside signage
Progress
  • Project completed in early 2008
Construction detailsDesign and planning: Hyder Consulting
Construction: BMD Constructions

Drouin

LocationDrouin Railway Station
(Gippsland rail line)
Features
  • 160 space car park
  • New covered walkway
  • Improved lighting
  • New roadside signage
Progress
  • Project completed in early 2008
Construction detailsDesign and planning: Hyder Consulting
Construction: BMD Constructions

Garfield

LocationGarfield Railway Station
(Gippsland rail line)
Features
  • an upgraded and expanded car park
  • new roadside signage
Construction detailsDesign and planning: Hyder Consulting

Gisborne

LocationGisborne Railway Station
(Bendigo rail line)
Features
  • an upgraded 170 space car park
  • new covered walkways
  • improved lighting
  • more secure car parking including Closed Circuit TV coverage.
Progress
  • Project completed early 2008
Construction detailsDesign and planning: Hyder Consulting

Lara

LocationLara Railway Station
(Geelong rail line)
Features$600,000 in works including:
  • Carparking spaces increased from 226 to 352
  • Covered walkway
  • More lighting
  • New roadside signage
Progress
  • Project completed in November 2007
Construction detailsDesign and planning: Hyder Consulting
Construction: BMD Constructions

Wallan

LocationWallan Railway Station
(Seymour rail line)
Features
  • Upgraded and extra car parking
  • Covered walkway
  • Directional signage
  • Improved lighting
  • New bus facilities
ProgressProject completed in May 2008
Construction detailsDesign and planning: Hyder Consulting
top

Background

The Government has allocated $5 million from the Moving Forward provincial statement for the construction of the park and ride facilities.

The project aims to encourage more people to leave behind their cars and travel by train into Melbourne, in turn, reducing congestion on major arterial roads.

Sites for the Parkways were chosen based on a combination of the following:
  • proximity of the station to a major highway or freeway
  • availability of land for car parking
  • existing facilities at the station
  • frequency of existing train services at the station
  • proximity of the station to residential and/or shopping areas
  • potential number of passengers that will have access to the station
  • competitiveness of rail travel times from the station into the metropolitan area in comparison to both current and future car travel times.